ARGE Bavaria Loop Nord 40" Pipeline
Section between Schwandorf and Forchheim, Germany
for our client:
Open Grid Europe GmbH
Scope of work:
- 63.6 km / 39,5 mi Pipeline Construction DN 1000 / 40", DP 100 / ANSI 600#
- construction of 3 pig trap stations
- construction of 4 valve stations
Special features:
- several crossings using thrust boring technique
- two water crossings (culvert construction)
- crossing of Vils River (Microtunneling, 56")
- crossing of road St2394/railway 5850 (Microtunneling, 56")
- crossing of Main-Donau-Canal (Microtunneling, 56")
- crossing of motorway A 3 (Microtunneling, 56")
Time-frame of construction: August 2016 - October 2017