Section between Schwandorf and Forchheim, Germany
fo" /> Section between Schwandorf and Forchheim, Germany
fo"/>
Surprise Me!

ARGE Bavaria Loop Nord 40" Pipeline Construction

2017-05-08 6 Dailymotion

ARGE Bavaria Loop Nord 40" Pipeline
Section between Schwandorf and Forchheim, Germany
for our client:
Open Grid Europe GmbH

Scope of work:
- 63.6 km / 39,5 mi Pipeline Construction DN 1000 / 40", DP 100 / ANSI 600#
- construction of 3 pig trap stations
- construction of 4 valve stations

Special features:
- several crossings using thrust boring technique
- two water crossings (culvert construction)
- crossing of Vils River (Microtunneling, 56")
- crossing of road St2394/railway 5850 (Microtunneling, 56")
- crossing of Main-Donau-Canal (Microtunneling, 56")
- crossing of motorway A 3 (Microtunneling, 56")

Time-frame of construction: August 2016 - October 2017
http://www.pipelinesystems.com