President Marcos has led the partial reopening of the San Juanico Bridge to two-way traffic, with a 15-ton limit, assuring Eastern Visayas residents that the full 33-ton, two-way capacity will be restored next year once major repairs are completed.
READ: https://mb.com.ph/2025/12/12/marcos-reopens-san-juanico-bridge-to-two-way-traffic-vows-full-rehabilitation-by-2026
Subscribe to the Manila Bulletin Online channel! - https://www.youtube.com/TheManilaBulletin
Visit our website at http://mb.com.ph
Facebook: https://www.facebook.com/manilabulletin
Twitter: https://www.twitter.com/manilabulletin
Instagram: https://instagram.com/manilabulletin
Tiktok: https://www.tiktok.com/@manilabulletin
#ManilaBulletinOnline
#ManilaBulletin
#LatestNews