Dizon inspects Pavia flyover
Public Works Secretary Vince Dizon inspects the Aganan Flyover in Pavia, Iloilo, on Monday, Jan. 19, as the agency vowed to complete the unfinished flyover this year with an allocation of P229 million. Dizon said the DPWH will prioritize safety in completing the project, noting that they will get a foreign consultant to ensure that the new design for the flyover is structurally safe. The flyover started construction in 2019 but was suspended in October 2022 due to discrepancy in foundation design identified in soil tests.
VIDEO BY RJAY ZURIAGA CASTOR
Subscribe to The Manila Times Channel - https://tmt.ph/YTSubscribe
Visit our website at [https://www.manilatimes.net](https://www.manilatimes.net/)
Follow us:
Facebook - https://tmt.ph/facebook
Instagram - https://tmt.ph/instagram
Twitter - https://tmt.ph/twitter
DailyMotion - https://tmt.ph/dailymotion
Subscribe to our Digital Edition - https://tmt.ph/digital
Check out our Podcasts:
Spotify - https://tmt.ph/spotify
Apple Podcasts - https://tmt.ph/applepodcasts
Amazon Music - https://tmt.ph/amazonmusic
Deezer: https://tmt.ph/deezer
Stitcher: https://tmt.ph/stitcher
Tune In: https://tmt.ph/tunein
#TheManilaTimes
#TMTNews